2017 Bridge C – Ziplining

6A3A5073-X2

Bridge C – Zip-lining

Day I of Bridge C sent the girls to new heights as they zip-lined through Berkshire East Mountain Resort, New England’s largest zip line destination.

Bridges are designed to connect sessions and give athletes recovery time after or between sessions to optimize peak performance, avoid overexertion, and bond with other campers.

View Gallery / Buy Photos

Leave a Reply

Your email address will not be published. Required fields are marked *